Facilities Stewardship Short List FY26

Facilities Projects Overview

Summer Project on the Horizon

  • Stormwater treatment construction to comply with Vermont's 3-Acre Rule.

Future Priorities (2-5 Years)
The following items are listed on the current facilities stewardship plan as priorities for the next 2–5 years. However, completing all these projects within the five-year timeframe would require securing additional funding, such as a bond, as current Capital Reserves are insufficient:

 

ANWSD Districtwide or Multi School Projects

 
  • Integrate Web Based Clock Systems at Elementary Schools with system at Vergennes Union/Middle High School
  • Abatement of Remaining Asbestos (which is done only during ongoing construction projects as needed)
  • Replacement of Trailers 
  • Replacement of Walkbehind Scrubber
  • Replacement of Vehicles: Child Nutrition Van/O&M Truck

Ferrisburgh Central School

 
  • Upgrade/Replacement of Building Controls
  • Carpet and Flooring Replacement
  • Install New Interior Storefront Doors and Glass Wall in Main Egress
  • Replacement of Windows from 2011 Project
  • Gym Equipment Replacement
  • Playground Equipment Upgrades
  • Dugouts for Athletic Fields
  • Kitchen Equipment Upgrades
  • Fire Alarm Upgrades
  • Upgrades to Modular Unit
  • Wall Finish Preparations and Paint
  • Asphalt Upgrades and Paving
  • Security Cameras Upgrades

Vergennes Union Elementary School

 
  • Replacement of Flooring from 2012
  • Gym Equipment Replacement
  • Playground Equipment Upgrades (Swings and Sandboxes completed Fall 2024)
  • Sump Pump Discharge to City Sewer Upgrades
  • Remaining Window Replacements in Quad and Above Gym
  • Replace Siding on North and East Sides of Building (South side completed Summer of 2024) 
  • Roof Replacement 
  • Building Camera Upgrade/Replacement 

Vergennes Union Middle/High School

 
  • Replacement of Air Handlers not done in 2018 Project
  • Replacement of Windows and Siding (C & D Wings)
  • Door Replacements on Aluminum Jambs
  • Middle School Gym Equipment Replacements
  • High School Gym Dividers, Bleachers, Hoops
  • B Wing Science Lab Upgrades
  • Shop Class Ventilation and Smog Hog Replacement
  • Greenhouse and CAD Lab Upgrades
  • Asphalt Replacement
  • Painting of Parking Lot and Crosswalks Striping
  • Sidewalk Engineering and Replacement on West Side to Monkton Road
  • Replace Remaining Roofs at End of Life Expectancy
  • Exterior Concrete Stairs (Gym Entrance) Replacement
  • Replacement of Outdoor Batting Cage 

 

 