Facilities Stewardship Short List FY25

Facilities Projects Overview

Spring Projects
The following facilities projects have already been approved, funded, and are scheduled to begin this spring:

  • Roofing at VUMHS for:
    • Main C-Wing (N)
    • B Wing (F)
    • Extension of B Wing (G)
    • Small roof off the Middle School Gym (D)

Summer Project on the Horizon

  • Stormwater treatment construction to comply with Vermont's 3-Acre Rule.

Future Priorities (2-5 Years)
The following items are listed on the current facilities stewardship plan as priorities for the next 2–5 years. However, completing all these projects within the five-year timeframe would require securing additional funding, such as a bond, as current Capital Reserves are insufficient:

ANWSD Districtwide or Multi School Projects

  • Integrate Web Based Clock Systems at Elementary Schools with system at Vergennes Union/Middle High School
  • Abatement of Remaining Asbestos (which is done only during ongoing construction projects as needed)


 

Ferrisburgh Central School

  • Upgrade/Replacement of Building Controls
  • Carpet and Flooring Replacement
  • Gym Equipment Replacement
  • Playground Equipment Upgrades
  • Dugouts for Athletic Fields
  • Kitchen Equipment Upgrades
  • Fire Alarm Upgrades
  • Upgrades to Modular Unit
  • Wall Finish Preparations and Paint
  • Asphalt Upgrades and Paving

Vergennes Union Elementary School

  • Replacement of Flooring from 2012
  • Gym Equipment Replacement
  • Playground Equipment Upgrades (Swings and Sandboxes completed Fall 2024)
  • Sump Pump Discharge to City Sewer Upgrades
  • Remaining Window Replacements in Quad and Above Gym
  • Replace Siding on North and East Sides of Building (South side completed Summer of 2024)

Vergennes Union Middle/High School

  • Replacement of Air Handlers not done in 2018 Project
  • Replacement of Windows and Siding (C & D Wings)
  • Door Replacements on Aluminum Jambs
  • Middle School Gym Equipment Replacements
  • High School Gym Dividers, Bleachers, Hoops
  • B Wing Science Lab Upgrades
  • Shop Class Ventilation and Smog Hog Replacement
  • Greenhouse and CAD lab upgrades
  • Asphalt replacement
  • Sidewalk engineering and replacement on west side to Monkton road
  • Replace Remaining Roofs at end of life expectancy

 