Facilities Stewardship Short List FY25
Facilities Projects Overview
Spring Projects
The following facilities projects have already been approved, funded, and are scheduled to begin this spring:
- Roofing at VUMHS for:
- Main C-Wing (N)
- B Wing (F)
- Extension of B Wing (G)
- Small roof off the Middle School Gym (D)
Summer Project on the Horizon
- Stormwater treatment construction to comply with Vermont's 3-Acre Rule.
Future Priorities (2-5 Years)
The following items are listed on the current facilities stewardship plan as priorities for the next 2–5 years. However, completing all these projects within the five-year timeframe would require securing additional funding, such as a bond, as current Capital Reserves are insufficient:
ANWSD Districtwide or Multi School Projects
- Integrate Web Based Clock Systems at Elementary Schools with system at Vergennes Union/Middle High School
- Abatement of Remaining Asbestos (which is done only during ongoing construction projects as needed)
|
Ferrisburgh Central School
- Upgrade/Replacement of Building Controls
- Carpet and Flooring Replacement
- Gym Equipment Replacement
- Playground Equipment Upgrades
- Dugouts for Athletic Fields
- Kitchen Equipment Upgrades
- Fire Alarm Upgrades
- Upgrades to Modular Unit
- Wall Finish Preparations and Paint
- Asphalt Upgrades and Paving
|
Vergennes Union Elementary School
- Replacement of Flooring from 2012
- Gym Equipment Replacement
- Playground Equipment Upgrades (Swings and Sandboxes completed Fall 2024)
- Sump Pump Discharge to City Sewer Upgrades
- Remaining Window Replacements in Quad and Above Gym
- Replace Siding on North and East Sides of Building (South side completed Summer of 2024)
|
Vergennes Union Middle/High School
- Replacement of Air Handlers not done in 2018 Project
- Replacement of Windows and Siding (C & D Wings)
- Door Replacements on Aluminum Jambs
- Middle School Gym Equipment Replacements
- High School Gym Dividers, Bleachers, Hoops
- B Wing Science Lab Upgrades
- Shop Class Ventilation and Smog Hog Replacement
- Greenhouse and CAD lab upgrades
- Asphalt replacement
- Sidewalk engineering and replacement on west side to Monkton road
- Replace Remaining Roofs at end of life expectancy
|