Facilities Stewardship Short List FY26
Facilities Projects Overview
Summer Project on the Horizon
Future Priorities (2-5 Years)
The following items are listed on the current facilities stewardship plan as priorities for the next 2–5 years. However, completing all these projects within the five-year timeframe would require securing additional funding, such as a bond, as current Capital Reserves are insufficient:
|
ANWSD Districtwide or Multi School Projects
- Integrate Web Based Clock Systems at Elementary Schools with system at Vergennes Union/Middle High School
- Abatement of Remaining Asbestos (which is done only during ongoing construction projects as needed)
- Replacement of Trailers
- Replacement of Walkbehind Scrubber
- Replacement of Vehicles: Child Nutrition Van/O&M Truck
|
Ferrisburgh Central School
- Upgrade/Replacement of Building Controls
- Carpet and Flooring Replacement
- Install New Interior Storefront Doors and Glass Wall in Main Egress
- Replacement of Windows from 2011 Project
- Gym Equipment Replacement
- Playground Equipment Upgrades
- Dugouts for Athletic Fields
- Kitchen Equipment Upgrades
- Fire Alarm Upgrades
- Upgrades to Modular Unit
- Wall Finish Preparations and Paint
- Asphalt Upgrades and Paving
- Security Cameras Upgrades
|
|
Vergennes Union Elementary School
- Replacement of Flooring from 2012
- Gym Equipment Replacement
- Playground Equipment Upgrades (Swings and Sandboxes completed Fall 2024)
- Sump Pump Discharge to City Sewer Upgrades
- Remaining Window Replacements in Quad and Above Gym
- Replace Siding on North and East Sides of Building (South side completed Summer of 2024)
- Roof Replacement
- Building Camera Upgrade/Replacement
|
Vergennes Union Middle/High School
- Replacement of Air Handlers not done in 2018 Project
- Replacement of Windows and Siding (C & D Wings)
- Door Replacements on Aluminum Jambs
- Middle School Gym Equipment Replacements
- High School Gym Dividers, Bleachers, Hoops
- B Wing Science Lab Upgrades
- Shop Class Ventilation and Smog Hog Replacement
- Greenhouse and CAD Lab Upgrades
- Asphalt Replacement
- Painting of Parking Lot and Crosswalks Striping
- Sidewalk Engineering and Replacement on West Side to Monkton Road
- Replace Remaining Roofs at End of Life Expectancy
- Exterior Concrete Stairs (Gym Entrance) Replacement
- Replacement of Outdoor Batting Cage
|